Blog

8 people refuge chamber

EEx-d Pressurized Refuge Chamber for Herrenknecht

30 aprile 2014

UPSX is a Refuge Chamber specifically designed and manufactured in order to provide a safe haven in the event of underground emergency to personnel working in Mines, NATM and TBM excavated tunnels. Construction The Refuge Chamber is a fire rated enclosure capable to endure for the minimum specified time at the specified condition in the … Read more

WeWalter will Try to be in “Metro Lima” Project in Peru

9 aprile 2014

WEWALTER and PATHROS, our distributor in Peru, will try to be in the new project “Linea 2 Metro Lima Callao”. Last 28th March 2014, this project was awarded to “Consorcio Nuevo Metro”. The “Consorcio Nuevo Metro de Lima” is composed by the following international companies: Cosapi S.A. (Perú) Impregilo S.p.A. (Italia) Iridium Concesiones de Infraestructura … Read more

WeWalter Cabins Genova Harbor

Shipping WeWalter Cabins to Iraq

17 marzo 2014

Last days we have found some pics of a important 2011 project. Very interesting photographs because they show our cabins mounted on truck chariot for road, and being shipped in Genova harbor. Our contractor was Sumitomo Corporation (Siemens), and the final client was Ministry of Electricity of Iraq. Were mobile containerized substations. una publicación de … Read more

Eni Siemens Iraq

WeWalter Composed Shelters for Eni Iraq

3 marzo 2014

For the project Zubair Oil Field Development. Our customer is Siemens Spa, Italian division. The end client is Eni Iraq Zfod Maintenance Department. External Dimensions of the big composed shelter are: 13.720 x 4.700 x 3.790 mm (LxDxH) This long shelter is composed by two mounted by long side 13.720 mm: – One medium voltage … Read more

Electric Shelter for Terna-Siemens in Trento (Italy)

14 febbraio 2014

Last weeks we have sent, commissioning, and  start this electric shelter, ordered by Siemens and end customer Terna. Terna is a big italian electric provider. Terna is the first independent operator in Europe and sixth in the world for kilometers of electricity lines managed. These are the features of our shelter, constructed completely in our … Read more

Shelte Tuscolano AT Terna

New Shelter Working in Toscolano Maderno (Brescia)

30 gennaio 2014

Prefabricated shelters with following dimensions: 12.190 L x 2.440 P x 2.790 H mm. Includes additional sloping roof with low environmental impact. Used as a semi-permanent installation for the monitoring and management of networks AT Terna in Toscolano-Maderno (Brescia – Italy). Including supports, stairs and railings.

Maintenance Electric Cabins

Reviews and Maintenance Tasks in our Electrical Cabins

7 gennaio 2014

This month we have made in the workshop of WeWalter review and extraordinary maintenance tasks of the cabins that you can see in the pictures. Review cab type PAK gallery 400KVA, 6000/400V Year built: 2000 Project: State Road 38 (Strada Statale 38) “Dello Stelvio” variant by S.Caterina Valfurva Bormio and Livigno, Italy.

Refuge Chamber Frejus

Refuge Chamber for Frejus Tunnel (Italy)

17 dicembre 2013

WeWalter has delivered this month a special shelter on skid. The customer has required us REI120 fire resistance at the maximum possible elements. We installed coating sandwich panels and rock wool REI120. Also a special door REI120. Following security systems, has installed a diffuser water system on the roof of the cab. Inside the cabin … Read more

Cutting Machine WeWalter

New Cutting Machine for WeWalter Workshop

3 dicembre 2013

  The existing machine cutting so far has 2,500 mm internal clearance. This allows us to cut lengths up to 3,000 mm. The new cutting machine was acquired to increase our capacity for cutting large containers. It has an internal clearance of 3,500 mm and this will allow us to build containers 3 meters high … Read more

Adipec 2013 Masterplan

WeWalter in ADIPEC 2013 Exhibition in Abu Dhabi

17 novembre 2013

Like every year, even in 2013 WeWalter participated in ADIPEC, the fair oil and gas located in Abu Dhabi. The success of the exhibition can be seen especially by the number of visitors who indicated an interest in our products. The market for oil and gas is now part of our business and we intend … Read more