Project

8 people refuge chamber

EEx-d Pressurized Refuge Chamber for Herrenknecht

30 aprile 2014

UPSX is a Refuge Chamber specifically designed and manufactured in order to provide a safe haven in the event of underground emergency to personnel working in Mines, NATM and TBM excavated tunnels. Construction The Refuge Leggi tutto…

WeWalter will Try to be in “Metro Lima” Project in Peru

9 aprile 2014

WEWALTER and PATHROS, our distributor in Peru, will try to be in the new project “Linea 2 Metro Lima Callao”. Last 28th March 2014, this project was awarded to “Consorcio Nuevo Metro”. The “Consorcio Nuevo Leggi tutto…

WeWalter Cabins Genova Harbor

Shipping WeWalter Cabins to Iraq

17 marzo 2014

Last days we have found some pics of a important 2011 project. Very interesting photographs because they show our cabins mounted on truck chariot for road, and being shipped in Genova harbor. Our contractor was Leggi tutto…

Eni Siemens Iraq

WeWalter Composed Shelters for Eni Iraq

3 marzo 2014

For the project Zubair Oil Field Development. Our customer is Siemens Spa, Italian division. The end client is Eni Iraq Zfod Maintenance Department. External Dimensions of the big composed shelter are: 13.720 x 4.700 x Leggi tutto…

Electric Shelter for Terna-Siemens in Trento (Italy)

14 febbraio 2014

Last weeks we have sent, commissioning, and  start this electric shelter, ordered by Siemens and end customer Terna. Terna is a big italian electric provider. Terna is the first independent operator in Europe and sixth Leggi tutto…

Shelte Tuscolano AT Terna

New Shelter Working in Toscolano Maderno (Brescia)

30 gennaio 2014

Prefabricated shelters with following dimensions: 12.190 L x 2.440 P x 2.790 H mm. Includes additional sloping roof with low environmental impact. Used as a semi-permanent installation for the monitoring and management of networks AT Leggi tutto…

Maintenance Electric Cabins

Reviews and Maintenance Tasks in our Electrical Cabins

7 gennaio 2014

This month we have made in the workshop of WeWalter review and extraordinary maintenance tasks of the cabins that you can see in the pictures. Review cab type PAK gallery 400KVA, 6000/400V Year built: 2000 Leggi tutto…

Refuge Chamber Frejus

Refuge Chamber for Frejus Tunnel (Italy)

17 dicembre 2013

WeWalter has delivered this month a special shelter on skid. The customer has required us REI120 fire resistance at the maximum possible elements. We installed coating sandwich panels and rock wool REI120. Also a special Leggi tutto…

Cutting Machine WeWalter

New Cutting Machine for WeWalter Workshop

3 dicembre 2013

  The existing machine cutting so far has 2,500 mm internal clearance. This allows us to cut lengths up to 3,000 mm. The new cutting machine was acquired to increase our capacity for cutting large Leggi tutto…

Adipec 2013 Masterplan

WeWalter in ADIPEC 2013 Exhibition in Abu Dhabi

17 novembre 2013

Like every year, even in 2013 WeWalter participated in ADIPEC, the fair oil and gas located in Abu Dhabi. The success of the exhibition can be seen especially by the number of visitors who indicated Leggi tutto…

Copyright © 2017 We Walter S.r.l. – Viale Toscana, 40, Cologno Monzese – 20093, Milan, Italy – VAT: IT00807580964
 All Rights Reserved — Created with WordPress and Performed by WebVaiLog in

ISO_9001_COL_traspENG